Awarded Projects

Houston Tank Terminal
Estimated and Awarded EPC project consisting of engineering, procurement and construction of the Houston Terminal two storage tanks with capacity of 300,000 barrels of crude oil each. Project Scope Engineering, Sitework, Civil, Structural Steel, Tanks and Containment, Buildings, Equipment, Piping, Electrical and Instrumentation, Painting.

Compressor Station 563
Estimated and Awarded the construction of greenfield Compressor Station in Nashville TN. Project consisted of Site Work, Concrete, Structural Steel, Equipment Setting, Piping, Testing, E&I,  Painting and Commissioning. The CS 563 is fitted with two 30,000 hp Solar Titan 250 turbine compressor units.

Midland to Sealy Pump Stations
Estimated and Awarded Midland To Sealy Pump Station EPC project Ivie Lake Pump Station mainline 5000 HP electric Communications building, sump pump, sump tank
Tennyson Station 2 mainline 5000 HPÂ Communications Building, Sump Pump, Sump Tank
fabrication, civil and site development, I&E, and hydro-testing

TL 635 CRE-LCS & TL6917 CRE-SX Fiber Build
Estimated and awarded the construction of the TL 635 CRE-LCS & TL6917 CRE-SX Fiber build project. The project is yo install approximately 15.1 miles of overhead 96-Count ADSS Fiber Optic Cable on TL6917b the fiber will attach to 127 existing structures on TL6917, 11 structures on adjacent Distribution Circuits and on two new structures for fiber only.

Landfill Gas to Energy
Estimated and Awarded the construction of Landfill Gas to Energy Facility, LFG is extracted from landfills using a series of wells and a blower/flare (or vacuum) system. This system directs the collected gas to a central point where it can be transported, compressed, and filtered before it is combusted to generate electricity.

Condensate Tank Project
Estimated and Awarded the EPC contract for the engineering, construction, and procurement of an aboveground elevated condensate tank and the installation of double wall containment pipe to the LACT skid, installation of LACT Skid, and piling.

SENM Gathering System Project
Estimated and was Awarded the construction of the 51 miles of crude oil buried pipeline and associated aboveground appurtenant facilities in Lea and Eddy Counties, New Mexico. Included in the award the construction of four stations include two new origination stations, a new pump station, and expansion of the existing Station.

Iowa Fertilizer Storage Terminal
Estimated and Awarded an EPC Ammonia Fertilizer Storage and Handing System. Estimated the Engineering, Procurement and Construction costs for the Ammonia Storage and Handling Systems which consisted of 2 Two Ammonia Tanks and Three UAN Tanks, Process Piping, Structural Steel and Site Work, and Civil Foundations.